TEL: Facebook/wechat/WhatsApp:+8619936624847 LINE:daqiot

Industrial Data Collection Project for Landis+Gyr Electric Meter Based on IEC 62056-21

Jul,01,2026 << Return list

Project Case: IEC 62056-21 Smart Meter Data Acquisition Solution

1. Project Overview

This project demonstrates the application of our industrial gateway for smart meter remote data acquisition based on the IEC 62056-21 protocol. The system is designed for stable and efficient reading of electricity meter data in utility monitoring and energy management applications.

The solution has been successfully tested and deployed with Landis+Gyr smart meters, ensuring full compatibility and reliable communication performance.

1.jpg

2. System Configuration & Communication Workflow

A complete data acquisition cycle consists of a sequence of communication commands. The interval between commands is defined as the Acquisition Interval Time, while the time between two full acquisition cycles is defined as the Acquisition Waiting Time.

For low-frequency data collection scenarios, the recommended configuration is:

· Acquisition Interval Time: 500 ms 

· Receive Waiting Time: 500 ms 

· Acquisition Waiting Time: 20000 ms 

3. Meter Communication Settings

· Service Address: typically 1 

· Client Address: typically 16 

· Address can be confirmed via meter label, display, or technical manual if different. 



4. Protocol & Data Format

Supported Protocol

· IEC 62056-21 (IEC 1107 compatible mode) 

Character Format (ISO 1177:1985)

· 1 start bit

· 7 data bits

· 1 parity bit

· 1 stop bit

Optional transparent mode:

· 1 start bit

· 8 data bits

· 1 stop bit 

5. Data Readout Mode

When receiving the response:
ACK 0 Z 0 CR LF,
the meter outputs a predefined dataset according to protocol specifications.

If no standard selection handshake is used, the data group may be empty.

The communication baud rate will fall back to 300 bps under the following conditions:

· Invalid or unsupported selection message

· Communication errors during handshake

· No response received from meter 

6. Encoding Configuration

In practical deployment, configuration requires setting:

· Data Type: Register

· OBIS Codes: defined according to meter model (may vary by manufacturer)

Common OBIS values should follow the actual meter specification.

7. Test & Verification

The system has been successfully tested in real-world scenarios with:

· Landis+Gyr smart meters 

· Stable IEC 62056-21 communication

· Reliable data acquisition via serial gateway integration

Attached materials (if applicable):

· System test video

· Project deployment images

· Meter communication screenshots showing IEC 62056-21 protocol 

8. Application Scenarios

· Smart grid energy monitoring

· Utility electricity metering systems

· Remote meter reading (AMR/AMI)

· Industrial energy management systems

· Power distribution monitoring projects 

9. Conclusion

This solution provides a stable and standardized method for smart meter data acquisition using the IEC 62056-21 protocol. It supports flexible configuration, reliable serial communication, and proven compatibility with mainstream utility meters such as Landis+Gyr, making it suitable for large-scale deployment in energy monitoring projects.